AFTER SHIPMENT / QUALITY RESPONSE
A customer report may describe a leaking lid, loose gasket, chipped finish or wrong pack. The first job is not to defend or blame; it is to identify the exact configuration and affected stock, then test a plausible cause. This page shows the evidence a brand and supplier should exchange to make a corrective decision.

Collect the SKU, body and lid version, color, order or lot reference, receiving date, affected quantity and observed failure. Photos should show the overall item, the defect, the packaging or label, and any part that appears to differ from the approved sample. Record how the product was used and cleaned, but do not treat a usage note as proof of cause.
| Evidence | Why it matters |
|---|---|
| Product and pack labels | Connects the report to a defined variant and shipment |
| Affected and unaffected samples | Shows whether the issue is isolated or repeated |
| Approved reference | Makes the comparison objective |
| Handling and use conditions | Helps design a relevant replication check |
Separate affected units or lots where possible. Avoid mixing suspect and cleared inventory while facts are still being collected.
The buyer and supplier should decide whether stock is held, screened, sampled further or used under an agreed condition. The decision depends on severity and available evidence.
Flag any shared part, artwork or process before a reorder repeats the same configuration. Temporary containment is not a permanent fix.
A leak report may arise from gasket seating, lid-to-body fit, closure design, damage or use conditions. A decoration complaint may involve surface preparation, finishing, transit abrasion or cleaning exposure. Compare returned units with a retained approved sample and, where useful, a current production sample. Select a test that reproduces the reported condition; a generic pass result from another model is not enough.
Related checkpoints appear in the leak-resistance validation and surface durability review pages.
| Decision layer | Question the record should answer |
|---|---|
| Root-cause hypothesis | What mechanism is supported by evidence, and what remains uncertain? |
| Correction | What happens to affected units now? |
| Corrective action | What process or component change addresses the verified mechanism? |
| Effectiveness check | What evidence will show the next approved run is controlled? |
If the investigation is inconclusive, say so. Do not close a case by renaming an unexplained defect as operator error. The buyer should approve any change that affects the signed-off product reference.
A close-out record should connect the complaint to the disposition of affected stock, the chosen action, the revised file or part number, and the check used before the next release. For issues found before shipment, see pre-shipment inspection. For reorder continuity, use version control.
Usually not. Photos help classify the failure and identify a variant; physical samples, records and a relevant replication check may still be needed.
No. First distinguish a design limitation from a part, assembly, finish, packing or handling deviation. Change only what the evidence supports.
Use available carton labels, invoice lines, order references and product versions to narrow scope, then record uncertainty explicitly.