PROGRAMME PLANNING / ASSORTMENT RELEASE
A launch with three body sizes, four colours and two lid choices is not a single product with a larger order quantity. It is an assortment of configurations, each with its own artwork, component, pack and receiving identity. This planning framework helps buyer and factory see the dependencies before one late variant holds up the whole programme.
List every sellable SKU and the variables that define it: body size, colour, lid or straw route, logo treatment, unit pack and destination. Mark which components are shared and which are unique. Then add the planned volume by variant as a working input. A total programme number can hide a tiny colour run that requires a separate setup or sample review.
| Layer | Decision to record |
|---|---|
| Product | Body, closure, gasket and capacity direction |
| Brand | Colour, artwork and decoration proof |
| Pack | Unit format, insert and carton identity |
| Order | Quantity by variant and intended market |
A range should look coherent together, but each variant also needs its own functional and visual checks where components or finishes differ. Keep an approval matrix that shows shared evidence and SKU-specific evidence. A passing blue bottle with a screw lid does not automatically approve a red bottle with a straw lid.
Use the buyer approval matrix to assign sign-off owners and keep open decisions visible.
Ask which variants share a body, which require a different decoration or pack, and how the factory will prevent mixing during assembly and carton packing. Establish the order of sample approvals, artwork release, component readiness and final packing instructions. If one SKU is delayed by an unresolved lid or colour, decide whether the rest of the assortment can proceed without creating a receiving problem.
Do not treat a proposed schedule as guaranteed. Confirm the project-specific route and commercial constraints after the full SKU table is reviewed.
Once the assortment is approved, track changes against the SKU table. An exception board can show the affected variant, issue, owner, required evidence and release impact. For example, a revised straw lid may affect only two colours but both retail packs; an artwork correction may leave the physical bottle unchanged while delaying carton printing. This view prevents a local edit from becoming a hidden programme-wide change.
Keep the board current through sample review, pilot production and final packing. At shipment, archive the released SKU table so a reorder starts from the actual delivered configuration, not an early presentation deck.
Provide the warehouse with a carton map that shows SKU, pack revision, quantity, lot reference and label rule. Decide whether mixed-SKU cartons are acceptable; if so, specify how contents will be identified. Match the shipment plan to the carton marking rule and final inspection scope. A launch is operationally ready only when buying, factory and receiving use the same variant names.
Send Golmate the assortment table, sample status and intended distribution channel. The team can then review the development and packing dependencies that matter most to this programme.