A custom shape or closure may require new design files, prototypes and tooling decisions. Buyers should agree who can use, access, maintain and transfer each asset before development begins. This page is a commercial discussion checklist, not legal advice or a statement of Golmate’s standard contract terms.

A ‘mold’ is not the whole development package. Separate industrial-design concepts, CAD or drawing files, prototype parts, production tooling, gauges, artwork, packaging dielines and test records. Each may have a different creator, custodian, format and permitted use. Ask what is new for the project and what is a pre-existing supplier platform component.
| Asset | Question for the agreement |
|---|---|
| New body or lid tooling | Who funds, holds, maintains and may use it? |
| CAD and drawings | Which editable and export formats are delivered? |
| Brand artwork | Who provides master files and approves revisions? |
| Shared components | What remains a standard or licensed platform element? |
A standard body with new decoration or packaging may minimize new tooling decisions, but the buyer still needs clear artwork and component-version records.
A revised lid, handle or insert may affect compatibility and approval scope. Record whether the change creates a project-specific asset.
A new body or closure deserves an explicit file, tooling, maintenance and exit discussion before the first production order.
At concept approval, freeze the intended use and design responsibility. At prototype approval, name the drawing revision and measured interfaces. At tooling release, identify the tool and accepted changes. At production approval, tie the final sample, bill of materials, artwork and packaging to one SKU revision. Refer to tooling and mold planning for development-stage technical decisions and buyer approval matrix for sign-off ownership.

| Topic | Clarification to request |
|---|---|
| Access | Who can inspect or request current drawings and tooling records? |
| Maintenance | Who decides on repair, replacement and requalification? |
| Change rights | Can either party alter the asset without the other’s approval? |
| Transfer | What information and practical steps would a handoff require? |
| Confidentiality | Which pre-existing designs and buyer materials are protected? |
The answers belong in a project-specific written agreement reviewed by appropriate advisers. Do not assume payment alone settles intellectual-property or transfer rights.
If a file or tool is not part of the agreed deliverables, state that explicitly. Silence at this stage can cause a dispute at the next reorder.
Not necessarily. Ownership, use rights, custody, maintenance and transfer conditions should be documented in the applicable agreement.
Yes, depending on the agreed design route. Identify them early so project-specific rights are not confused with pre-existing components.
At each decision gate, record the approved revision. The final production file set should match the signed-off sample and specification.